- Home
- How it works
How it works
Installed properly, from first visit to final inspection.
Every Talos installation follows the same careful process: a private consultation, a clear written proposal, a precision installation that protects your property, and aftercare that keeps your film performing.
The process
Four steps. Zero fuss.
- 01
Private consultation
We visit, assess your glass, frames and surfaces, take measurements, and listen to what you want protected.
- 02
Tailored proposal
You receive a clear written quote with film thickness, finish and anchoring specified, shown on samples in your own light.
- 03
Precision installation
Trained installers, protected floors and furnishings, film applied edge to edge, and a spotless finish on every pane.
- 04
Aftercare
A final walk-through, a care guide covering curing and cleaning, and warranty documentation for your peace of mind.
On installation day
What to expect.
- Floors and furnishings protected before we begin
- Glass and frames cleaned and prepared
- Film cut to fit and applied edge to edge
- Security film anchored to the frame with DOWSIL™ 995
- The work area cleaned and every pane inspected
- A walk-through with you before we leave
Most residences are completed in a day or two. Commercial projects are typically scheduled outside trading hours. Film needs a short curing period afterwards, and we explain exactly what to expect and how to care for it.
The Talos standard
How we work.
In Greek myth, Talos was the bronze guardian who circled Crete three times each day — vigilant and tireless. We took the name as a standard for how we work.
Security · Protection · Privacy
Trained installers
Skilled, careful hands on every pane and surface — never rushed, never sloppy.
Respect for your home
Floors and furnishings protected, shoes off, and the space left immaculate.
Transparent quotes
Clear scope and pricing in writing, so there are no surprises on the day.
On schedule
Installed around your day or your trading hours, with minimal disruption.
A flawless finish
Film applied cleanly edge to edge, with no bubbles, gaps or debris trapped beneath it.
Aftercare & warranty
Documentation and support long after the last pane is done.
In the field
Our installs, filmed on the job.
No stock footage. Every step below is from our own installations.
Begin
Let's protect what you've built.
Request a private consultation. We'll assess your glass and surfaces on site and give you a clear written proposal.
